Skip to content
Houses on a Laguna Beach hillside

Living here

Accessory Dwelling Units in Laguna Beach

Laguna Beach allows accessory dwelling units (ADUs) and junior ADUs (JADUs) under state law, its municipal code and its coastal program. Since March 2025 a city urgency ordinance has set the local rules, and most ADUs that add new living space also need a Coastal Development Permit.

Photo: Beyond My Ken, CC BY-SA 4.0

Review time
60 days from a complete application, with limits
Coastal permit
Needed for ADUs that add new living space
JADU size
500 square feet, inside a single-family home
Rental term
No rentals shorter than 30 days
Planning
(949) 497-0713

An accessory dwelling unit is an additional home on a lot with a main home, with its own kitchen, bathroom, living area and entrance. This guide summarizes what the city, its ADU ordinance and the state’s housing department publish. It is not legal advice; confirm anything about your lot with Planning.

ADUs and JADUs

  • ADU: A unit that is attached to the main home, detached from it or converted from existing space.
  • JADU: A junior ADU. The city limits it to 500 square feet, inside an existing or proposed single-family home, with at least an efficiency kitchen. An attached garage counts as part of the home.

Without a coastal permit, a building permit alone covers a converted ADU and a JADU on a single-family lot, or a detached ADU of up to 800 square feet with 4-foot side and rear setbacks. Multifamily lots follow separate rules.

Which rules apply

Three layers apply: state law, Chapter 25.17 of the municipal code and the city’s certified Local Coastal Program. The city’s FAQ says state law requires ministerial approval, but processing must still comply with the Coastal Act, and the Coastal Zone covers all of Laguna Beach except the Sycamore Hills area.

The 2025 urgency ordinance

On March 11, 2025 the City Council adopted Urgency Ordinance No. 1713, which repealed and replaced Chapter 25.17 to follow changes in state law and took effect immediately. On October 28, 2026 the city’s code website said the urgency ordinance remains in effect for applications filed on or after March 12, 2025, and listed it as expiring December 9, 2026. A regular ordinance adopted March 25, 2025 (No. 1715) was listed as pending Coastal Commission certification.

The chapter text printed under that notice is the older 2023 version. The standards below come from the urgency ordinance and HCD; confirm them with Planning at (949) 497-0713, especially after December 9, 2026.

How the process works

  1. Check your lot. Ask Planning whether it is in the Coastal Zone or a wildland-urban interface area, and which path your type of unit follows.
  2. Apply through the Public Permit Portal. Complete the city’s planning application, register for the portal and upload plans.
  3. Get the Coastal Development Permit if you need one. In the Coastal Zone, an ADU that creates new livable space needs one before a building permit can issue. Converting existing livable space in a legally established home is exempt, and the city’s FAQ says a JADU is exempt. The permit can be a de minimis waiver, a minor development permit or a standard permit with a hearing, with mailed notice to neighbors. The city says it cannot weigh private views.
  4. Wait for review. Without a coastal permit, the city has 60 days from a complete application to approve or deny it. The city’s FAQ says coastal permits follow Permit Streamlining Act timelines; HCD says state law sets 60 days for those too when a home already stands on the lot.
  5. Pull the building permit and build. The building permits guide covers the portal, inspections and design review.

An ADU that does not meet the ordinance’s objective standards may still be allowed with a conditional use permit.

Standards in the urgency ordinance

The size, setback, design and parking rules below apply to ADUs that need the city’s ADU permit. The height, rental and occupancy rules apply to ADUs approved under the ordinance generally.

  • Size: 850 square feet for a studio or one bedroom, 1,000 for two or more. An attached ADU is also capped at half the existing home’s floor area, but never below 800 square feet, the size HCD says local rules cannot block.
  • Setbacks: 4 feet on the sides and rear and 10 feet in front, or none when rebuilding an existing structure in place.
  • Height: 16 feet for a detached ADU, or 18 feet within a half-mile walk of a major transit stop or high-quality transit corridor, plus up to 2 feet to match the main home’s roof pitch. An attached ADU may reach 25 feet or the zone’s limit, whichever is lower, and two stories.
  • Design: Materials, colors and roof slope match the main home, exterior lights are fully shielded and aimed down, and windows may not look directly onto a neighboring home unless screened.
  • Parking: One space per ADU, with exceptions that include a half-mile walk to public transit, conversions and a car share stop within one block.
  • Coastal Zone extras: Parking removed for the ADU is replaced on the lot. The ADU keeps 25 feet from the top of an oceanfront bluff and from a watercourse centerline, and may not have a roof deck.
  • Rental and sale: No rental shorter than 30 days and no separate sale. The short-term rental guide covers the city’s lodging rules.
  • Owner occupancy: ADUs created on or after January 1, 2020 carry no owner-occupancy rule. The ordinance requires an owner to live in the main home or the JADU on every lot with a JADU, backed by a recorded deed restriction. HCD says state law requires that only when the JADU shares sanitation facilities with the main home, so ask Planning how the city applies it.

Fire and wildfire rules

Chapter 14.70 of the municipal code adopts the California Wildland-Urban Interface Code for the exterior of new buildings, additions, alterations and repairs in wildland-urban interface areas, with local amendments such as a Class A roof and a 144-square-inch limit on each vent opening.

The ordinance requires sprinklers in an ADU only when the main home must have them, and an ADU does not trigger sprinklers in the existing home. HCD says a High Fire Hazard Severity Zone is not by itself a conclusive reason to restrict ADUs. The emergency alerts and wildfire guide covers evacuation zones and brush clearance.

Fees and money

  • Impact fees: The ordinance charges none on an ADU under 750 square feet, and HCD says state law bars them on an ADU of 750 square feet or less. Above that, fees are charged in proportion to the size of the main home. Impact fees do not include water or sewer connection charges.
  • Utility connections: A converted ADU on a single-family lot needs no new connection or connection fee. An ADU built with a new home needs its own connection and pays normal fees. Other ADUs may add a connection at a proportionate fee. Ask the providers in the utilities guide.
  • Fee refunds: The city’s housing page offers fee refunds for a 10-year commitment to affordable rent, citing section 25.17.070, which the urgency ordinance’s chapter does not contain. Ask Planning whether the refund still applies.
  • Loan program: The city’s housing page links the Orange County Housing Finance Trust’s Affordable ADU Loan Program interest list.
  • Rent estimate: If you plan to rent the unit, the ordinance asks for a projected rent with the building permit application, which the city says helps it earn affordable housing credit.

Unpermitted units

The city says an owner can get a confidential inspection by a licensed contractor before applying to legalize a unit. The urgency ordinance limits when the city can deny a permit to legalize an unpermitted ADU built before January 1, 2018. HCD’s handbook says state law now uses January 1, 2020 for that rule, so ask Planning which date applies.

Questions about a purchase

If you are weighing a property with an ADU, ask the seller for the permit and final inspection and ask Planning about its status. For homes and brokers, Realatrends Real Estate publishes this site at realatrends.com. The renting guide covers tenant rules, and the housing programs guide covers city programs.

Questions

Does an ADU in Laguna Beach need a Coastal Development Permit?

The city says an ADU in the Coastal Zone that creates new livable space needs one, and converting existing livable space is exempt. Its FAQ says a JADU is exempt. The Coastal Zone covers the whole city except the Sycamore Hills area.

How long does the city have to review an ADU application?

When no Coastal Development Permit is needed, the city's urgency ordinance gives staff 60 days to approve or deny a complete application, as state law does. Coastal permits follow separate rules, and HCD says state law sets a 60-day limit on those too when a home already stands on the lot.

Can you rent an ADU in Laguna Beach short term?

No. The city's urgency ordinance bars renting an ADU or JADU for a term shorter than 30 days. HCD says state law requires JADU rentals to be longer than 30 days.

Does the city charge impact fees on small ADUs?

The city's urgency ordinance charges no impact fee on an ADU under 750 square feet, and HCD says state law bars impact fees on an ADU of 750 square feet or less. Larger ADUs pay impact fees in proportion to the size of the main home.

What happens if a Laguna Beach ADU was built without a permit?

The city says an owner can get a confidential inspection by a licensed contractor before applying to legalize the unit. The urgency ordinance limits when the city can deny a permit to legalize an ADU built before January 1, 2018.

Get the moving checklist

The printable checklist by email: before you move, moving week and your first 30 days.

Or call (949) 494-8830. Your details go only to our real estate sponsor, Realatrends Real Estate (DRE #00925482); see our privacy notice.

Living here

More for your move

All of Living here

Last reviewed

Sources (8)
  1. City ADU page: ADUs may be new construction attached or detached or conversions of existing space and have their own kitchen, bathroom, living and entry areas; a JADU is limited to 500 square feet; ADUs and JADUs are regulated by state law, the municipal code and the certified Local Coastal Program; applications go through the Public Permit Portal in three steps; on March 11, 2025 the City Council adopted an urgency ordinance repealing and replacing Chapter 25.17 to comply with changes to state law, effective immediately; the ADU estimated rental amount form; a homeowner may get a confidential third-party code inspection from a licensed contractor before applying to legalize an unpermitted ADU or JADU; Community Development (949) 497-0712 and Planning (949) 497-0713: lagunabeachcity.net, checked 2026-10-28
  2. City ADU and JADU FAQ (current version linked from the city's ADU page): state law requires ministerial approval but processing must comply with the Coastal Act; in the Coastal Zone a CDP is needed for an ADU before a building permit can issue because the LCP requires a CDP for all ADUs that create new livable space, and converting existing livable space is exempt; a JADU is exempt from a CDP; staff has 60 days to act on a JADU or an ADU that needs no CDP, while a CDP follows Permit Streamlining Act timelines; CDP review can be de minimis, minor or standard development, with mailed notice to owners within 300 or 100 feet and residents within 100 feet; the city cannot consider private views in a CDP for an ADU: lagunabeachcity.net, checked 2026-10-28
  3. City Comcate FAQ: the Coastal Zone covers all of Laguna Beach except the Sycamore Hills area: clients.comcate.com, checked 2026-10-28
  4. Code website, Chapter 25.17 (read October 28, 2026; the code includes legislation through Ord. No. 1733 adopted August 4, 2026): an alert says Chapter 25.17 was repealed and replaced by Urgency Ordinance No. 1713, adopted March 11, 2025, which remains in effect and applies to ADU and JADU applications filed on or after March 12, 2025; the New Laws list shows Ord. 1713 expiring December 9, 2026 and Ord. 1715 (adopted March 25, 2025) pending Coastal Commission certification; the chapter text below the alert carries 2023 ordinance history (Ords. 1687 and 1691): ecode360.com, checked 2026-10-28
  5. Urgency Ordinance No. 1713 (Chapter 25.17 as replaced): JADU up to 500 square feet within an existing or proposed single-family structure, attached garage included, with an efficiency kitchen; converting existing livable space into an ADU or JADU is exempt from a CDP and other ADUs and JADUs need one; building permit only for a converted ADU and a JADU on a single-family lot or a detached ADU of 800 square feet or less with 4-foot side and rear setbacks; 60 days to approve or deny a complete application without a CDP, deemed approved after that with exceptions; ADU-permit size 850 square feet for a studio or one bedroom and 1,000 for two or more, attached ADUs limited to 50 percent of the existing home but never below 800 square feet; 4-foot side and rear and 10-foot front setbacks; detached height 16 feet, 18 feet within a half mile walking distance of a major transit stop or high-quality transit corridor plus 2 feet for roof pitch, attached up to 25 feet or the zone limit and two stories; matching materials, colors and roof slope; exterior lighting fully shielded and aimed downward; no direct line of sight to adjoining residential property; one parking space per ADU with exceptions including a half mile walking distance of public transit, conversions, historic districts and car share within one block; in the Coastal Zone, existing parking replaced one to one, 25-foot bluff-top and watercourse centerline setbacks, a 3-foot non-combustible firefighter access path and no roof decks; no rental for a term shorter than 30 days and no separate sale; no owner occupancy for ADUs created on or after January 1, 2020 and owner occupancy and a deed restriction for all JADUs; sprinklers in an ADU only if required in the primary residence and none triggered in the existing home; rent estimate with the building permit application if the owner intends to rent; no impact fee under 750 square feet and proportionate fees above; impact fees exclude water and sewer connection fees; ADU permit processing fee by resolution; utility connection and fee rules; the city may not deny a permit to legalize an unpermitted ADU built before January 1, 2018 on building-standard or ADU-law grounds unless correction is needed under Health and Safety Code 17920.3; nonconforming ADUs may be allowed with a conditional use permit: ecode360.com, checked 2026-10-28
  6. City housing page: Laguna Beach Municipal Code 25.17.070 allows fee refunds when an owner commits to renting an ADU at affordable rents for at least 10 years (Affordable ADU Agreement); share an ADU's estimated monthly rent to help the city obtain affordable housing credit; the Orange County Housing Finance Trust's Affordable ADU Loan Program interest list, which announces when the application portal will be live: lagunabeachcity.net, checked 2026-10-28
  7. HCD ADU Handbook (March 2026): permitting agencies must approve or deny a completed ADU or JADU application within 60 days when a dwelling exists on the lot; local rules may not prevent an 800 square foot ADU with 4-foot side and rear setbacks; base height of 16 feet for detached ADUs, 18 feet near major transit; no owner occupancy for ADUs, and for a JADU owner occupancy only when it shares sanitation facilities; JADUs cannot be short-term rentals and rentals must be longer than 30 days; impact fees prohibited for an ADU of 750 square feet or less and proportionate above; ADU construction cannot trigger sprinklers in the existing primary dwelling; state ADU law applies in the Coastal Zone without lessening the Coastal Act, and when a certified LCP contains ADU provisions a coastal permit for an ADU must be approved or denied within 60 days of a complete application if there is an existing primary dwelling; a High Fire Hazard Severity Zone is not a conclusive rationale to restrict ADUs; a local agency may not deny a permit for an unpermitted ADU built before January 1, 2020 because of building standards or ADU law: hcd.ca.gov, checked 2026-10-28
  8. Municipal Code Chapter 14.70 adopts the California Wildland-Urban Interface Code (Ord. 1725, December 18, 2025) for exterior materials of new buildings, additions, alterations and repairs in wildland-urban interface areas, with local amendments such as a Class A roof assembly and a 144 square inch limit on individual vent openings: ecode360.com, checked 2026-10-28